Attachment 1Attachment 2Consider the soil profile shown below . Engineers add 10 ft of compf compacted fill with a unit weightof 135 pot on top of the clay . Based on their calculations , they expect approximately 2 ft ofconsolidation settlement to occur . A piezometer is installed at the bottom of the clay layer inorder to monitor the time rate of consolidation . At some point in time the height of water in thepiezometer is 13 fi above the initial ground surface . Determine the followinga ) How much time has passed since the fill was added ( report your answer in days ) ?b ) How much consolidation settlement has occurred at this time ( report your answer in feet ) ?A structure cannot be built on the site until all of the consolidation settlement but 2 incheshas occurred . How many days must they wait until construction can begin ?d ) Recommend an engineering solution toeering solution that would allow them to begin construction in 30days or less( worth 25 points )1ISPOP1 10 FXClayYsat = 100 pot0 = 1.5Cr = 0.0CC = D .AC . = 0 . 2 t 2 / dayRock ( impervious )
Consolidation settlement
This is a sample question
Need help with a similar assignment?
Place an order at Study Pirate
Attach all custom instructions.
Make Payment. (The total price is based on number of pages, academic level and deadline)
We’ll assign the paper to one of writers and send it back once complete.